Foremost Pipeline Construction

An Affiliate of Sunland Construction, Inc.

Foremost Pipeline Construction offers distribution construction and joint trenching services from strategic locations in the Carolinas for gas transmission, gas distribution, and municipalities. With over 45 years of experience, Foremost has developed specialized crews with the expertise and know-how to perform these specialized services over a wide range of projects.

Services offered by Foremost:

Distribution construction; new construction and replacing bare steel mains
Joint trenching; simultaneous installation of gas, electric, & cable TV
Auger bore and directional bore; pipe ramming
Installation of steel mainlines
Installation of water mains; both PVC and ductile iron
Complete pipeline integrity services
Underground electrical maintenance
Gas line bridge crossing maintenance; clean and paint or wrap
Installation of anodes and anode beds

Our experience includes:

The installation of over 2,500 service connections per year.
The installation of over 25 miles distribution mains per year, both steel and HDPE pipe.
 
 Foremost Pipeline Construction 386 Frontage Road Gaston, SC 29053 Phone: 803.939.4832

   

 

© Copyright 2014, Sunland Construction, Inc. All rights reserved.

Site designed by Bizzuka Lafayette Website Design